Search engine :
Return to the menu
Vote:
Results:
0 Votes
MARCH 2013 - Volume: 88 - Pages: 161-163
Download pdf
ADIF (Administrator of Railway Infrastructures) hired SENER Engineering and Systems for controlling operation risks earth pressure balance TBM in high speed tunnel Sants-Sagrera in the city of Barcelona and in the tunnels of Montcada and Gerona.
Share:
© Engineering Journal Dyna 2006 - Publicaciones Dyna, S.L
Official Science and Technology Body of the Federation of Industrial Engineers' Associations
Address: Unit 1804 South Bank Tower, 55 Upper Ground, London UK, SE1 9EY
Email: office@revistadyna.com
Regístrese en un paso con su email y podrá personalizar sus preferencias mediante su perfil
Name: *
Surname 1: *
Surname 2:
Email: *